Analysis of preventive maintenance strategy in off-road trucks
Análise de estratégia de manutenção preventiva sistemática em caminhões fora de estrada
Adriane Freire Souza Silva; Elizeth Cristina Silva Santos; Rosana Maria do Nascimento Luz; Rafael da Silva Fernandes
Abstract
Keywords
Resumo
Palavras-chave
Referências
Associação Brasileira de Normas Técnicas – ABNT. (1994). ABNT NBR 5462:1994: reliability and main maintainability: terminology (p. 37). Rio de Janeiro: ABNT.
Associação Brasileira de Normas Técnicas – ABNT (2014).
Barlow, R., & Hunter, L. (1960). Optimum preventive maintenance policies.
Barlow, R., & Proschan, F. (1987).
Blanchard, B. S., & Fabrycky, W. J. (1998).
Bokrantz, J., Skoogh, A., Berlin, C., Wuest, T., & Stahre, J. (2020). Smart maintenance: a research agenda for industrial maintenance management. International Journal of Production Economics, 224, 107547.
Campos, V. F. (2004).
Carvalho, P. S. L., Silva, M. M., Rocio, M. A. R., & Moszkowicz, J. (2014).
Caterpillar. (2022). Mining Trucks: 797F
Corrêa, H. L., & Corrêa, C. A. (2012). Administração de produção e operações: manufatura e serviços
Doyen, L., & Gaudoin, O. (2004). Classes of imperfect repair models based on reduction of failure intensity or virtual age. Reliability Engineering & System Safety, 84(1), 45-56.
Doyen, L., & Gaudoin, O. (2011). Modeling and assessment of aging and efficiency of corrective and planned preventive maintenance.
Fernandes, R. S., Sousa, L. R. C., & Santos, T. L. (2021). Analysis, investigation and evaluation of quality management in the mining process: a case study on divergencies in iron ore stock deviations. Revista Produção Online, 21(3), 770-793.
Fernandes, R. S., Rocha, T. R., Coelho, J. M., & Andrade, D. F. (2023a). Development of a measurement instrument to evaluate integrated management systems and differences in perception: an approach to item response theory and the quality manageme nt process. Production, 33, e20220069.
Fernandes, R. S., Sousa, J. C. C., & Luz, R. M. N. (2023b). Integrated management analysis of production performance, maintenance, and PDCA cycle: a case study of the IPCC mining process. Revista Produção Online, 22(2), 2731-2762.
Gackowiec, P., Podobińska-Staniec, M., Brzychczy, E., Kühlbach, C., & Özver, T. (2020). Review of key performance indicators for process monitoring in the mining industry. Energies, 13(19), 5169.
Gilardoni, G. L., & Colosimo, E. A. (2007). Optimal maintenance time for repairable systems.
Gilardoni, G. L., Toledo, M. L. G., Freitas, M. A., & Colosimo, E. A. (2016). Dynamics of an optimal maintenance policy for imperfect repair models. European Journal of Operational Research, 248(3), 1104-1112.
Ishikawa, K. (1985).
Kang, N., Zhao, C., Li, J., & Horst, J. A. (2016). A Hierarchical structure of key performance indicators for operation management and continuous improvement in production systems. International Journal of Production Research, 54(21), 6333-6350.
Kardec, A., & Nascif, J. (2009).
Luz, A. B., & Lins, F. A. F. (2018).
Medeiros, L. A. A., Sousa, I. P., Fernandes, R. S., Luz, R. M. N., & Luz, M. A. L. (2022). Análise de confiabilidade para a redução do número de manutenções corretivas nos caminhões off-highway. In
International Council on Mining and Metals – ICMM. (2015).
Mohtasham, M., Mirzaei-Nasirabad, H., Askari-Nasab, H., & Alizadeh, B. (2021). Truck fleet size selection in open-pit mines based on the match factor using a MINLP model. Mining Technology, 130(3), 159-175.
Nakagawa, T. (1989). A replacement policy maximizing MTTF of a system with several spare units.
Oliveira, M. A. (2016). Sistema de gestão da manutenção baseada no grau de maturidade da organização no âmbito da manutenção (Tese de doutoramento). Universidade do Minho, Braga.
Osanloo, M., & Paricheh, M. (2020). In-pit crushing and conveying technology in open-pit mining operations: a literature review and research agenda. International Journal of Mining, Reclamation and Environment, 34(6), 430-457.
Pascual, R., Madariaga, R., Santelices, G., Godoy, D., & Droguett, E. L. (2016). A structured methodology to optimise throughput of production lines. International Journal of Mining, Reclamation and Environment, 30(1), 25-36.
Qiao, G., Schlenoff, C., & Weiss, B. A. (2017). Quick positional health assessment for industrial robot prognostics and health management (PHM). In
Rigdon, S. E., & Basu, A. P. (2000). Statistical methods for the reliability of repairable systems
Rocha, C. S., Cardoso, E. L. S. S., Fernandes, R. S., Branco, N. C. N. M., & Luz, R. M. N. (2021). Quality assessment of divergences causes in weighing copper ore at a mining company in the amazon region. International Journal of
Shiba, S., & Graham, A. (1997).
Slack, N., Chambers, S., Johnston, R., & Betts, A. (2013). Gerenciamento de
Toledo, M. L. G., Freitas, M. A., Colosimo, E. A., & Gilardoni, G. L. (2016). Optimal periodic maintenance policy under imperfect repair: a case study on the engines of off-road vehicles. IIE Transactions, 48(8), 747-758.
Xenos, H. G. (2014). Gerenciando a manutenção produtiva:
Zampolli, M. (2019). Gestão de ativos: guia para a aplicação da norma ABNT NBR ISO 55001 considerando as diretrizes da ISO 55002: 2018 (2ª ed.). Santiago: International Copper Association. Retrieved in 2023, October 16, from